PDA

View Full Version : LHC Sixtrack News



AMDave
10-24-2013, 09:15 PM
Problem October 23rd Fixed
The permissions on the directory for the logs was wrong.Corrected and results being uploaded. A fuller report anda new Status and Plans will be issued soonest.

More... (http://lhcathomeclassic.cern.ch/sixtrack/forum_thread.php?id=3783)