Quote Originally Posted by plonk420 View Post
heh, i assume you'll run as many PSUs at 240 as you can (for efficiency)?
Yup, that is the long term plan, although right now everything is still a mess and rigged up to the regular 120V circuit. Need to invest in some more power equipment. When all is said and done the 120V circuit will be dedicated for the AC only, and the 240 for the computing equipment, including the few bits and pieces that will have to work at 120V via the stepdown transformer.