Quote Originally Posted by NeoGen View Post
For example, if contest start is at midnight (GMT), the accepted time for switching projects and caching would be between noon and midnight on GMT schedule, 6 am to 6 pm in the USA (assuming GMT-6 location), and 10 am to 10 pm in Australia (assuming GMT+10 location)
Sounds good.